1994年发生在台湾海峡的一次地震海啸的数值模拟
The simulation of tsunami happened in the Taiwan Strait in 1994
-
摘要: 建立了一个地震海啸数值模式,模式包含越洋海啸传播部分和近岸海啸变形部分,在越洋海啸传播部分中采用线性浅水方程,使用蛙跃格式求解,并且选择合适的空间步长与时间步长,使差分格式中产生的数值频散与包辛尼斯克方程中的物理频散一致,这样在不影响海啸数值计算精度的前提下,节省了计算机的机时与内存.在近岸海啸变形部分的计算中,考虑了非线性对流项与海底摩擦项.同时该模式采用了多重网格嵌套技术,提高了所关心地区的计算精度.利用这个地震海啸模式模拟了1994年发生在台湾海峡的一次地震海啸,结果与观测记录较吻合.这个模型已用于我国沿海核电站可能最大地震海啸的数值计算.Abstract: In this paper,a tsunami numerical model is built.In computing the transoceanic tsunami propagation,the linear shallow-water equations are solved with leap-frog finite difference.Grid size and time step are selected in such a way that the numerical dispersion introduced by the leap-frog method is nearly the same as the frequency dispersion in Boussinesq equations.Therefore,computation time and memory are saved in the condition of notreducing the precision of tsunami computation.In the coastal transfor mation computation,the energy dissipation due to seabottom friction is included.In this model,a nested multiple grid system is developed to improve the resolution of important regions.The tsunami happened in the Taiwan Strait in 1994 is simulated by using this model.The simulation results agree with the observed ones.The model has been used to calculate the pr obable maximum tsunami(PMT) of the Fujian Hui'an Nuclear Power Plant.
-
Key words:
- earthquake tsunami /
- tsunami disaster /
- numerical simulation
-
杨华庭.海啸及太平洋海啸警报系统[J].海洋预报,1987,(增刊,风暴潮与海啸):68~76. YU Fu-jiang,YE Lin,WANG Xi-nian.Computation of possible maximum tsunami in Dayawan Bay[A].Procedings of The International Conference on Marine Disasters:Forecast and Reduction[C].1998.89~98. 叶琳,王喜年,包澄澜,中国的地震海啸及其预报服务[J]自然灾害学报,1994,3(1):100~103. KAJIURA K.The leading wave of tsunami[J].Bulletin of the Earthquake Research Institute,1963,41:535~571. PHILIP L,LIU F,SUNG B Yoon.Numerical Simulations of Tsunami Inundation at Hilo,Hawaii[A].TSUNAMI' 93,Proceedings of the IUGG/IOC International Tsunami Symposium[C],1993.257~269. YE Lin,WANG Xi-nian,BAO Chang-lan.Tsunami in the China seas and its warning service[A].TSUNAMI' 93,Proceedings of the IUGG/IOC International Tsunami Symposium[C].1993.171~777. IMAMURA F,GOTO C.Truncation error in numerical tsunami simulation by the finite difference method[J].Coastal Enginering in(Japanese),1988,JSCE31,245~263. AIDA I.Numerical experiments for the tsunami propagation the 1954 Niigata tsunami and 1968 Tokachi-oki tsunami[J].Bulletin of the Earthquake Research Institute,1969,47:498~512. SHUTO N.Numerical simulation of tsunami Its present and near future[A].TSUNAMIS,Natural Hazards[C].1989.171~191. YOON S B,LIU P L.Estimation of Tsunami Wave Heights along Southeastern Korean Shoreline[Z].School of Civil and Environmental Engineering,Cornell University,Ithaca,NY 14853,1991.
计量
- 文章访问数: 1289
- HTML全文浏览量: 17
- PDF下载量: 1499
- 被引次数: 0