Gutzler D.S.and K.Mo,Autocorrelation of Northern Hemisphere 500 mb height.Mon.Wea.Rev.,111(1983),1:155-164
|
Shukla,J.and D.S.Gutzler,lnterannual varibility and predictabity of 500 mb geopotential heights over the Northern Hemisphere.Mon.Wea.Rev.,111(1983),6:1273-1279.
|
张家诚、周家斌等,用车贝雪夫多项式研究月平均500毫巴等压面位势场的初步结果,气象学报,33(1963),2:231-243.
|
Shukla,J.Dynamical predictability of monthly means.J.Atmos.Sci.,38(1981),12:2547-2572.
|
Craddock,J.M.and C.R.FIood,Eigenvectors for representing the 500 mb geopotential surface over Northern Hemisphere.Quart.J.Meleor.Sci.,95(1969).405:576-593.
|
Box,G.E.P.snd G.M.Jenkins,Time Series Analysis:Forecasting and Control(Rev.) Holden-Day,1976,46-84
|
Carn,M.B.,Determining the order of an autoregressive modeLSerenth Conference of Probability and Statistics on Atmospheric Sciences.November 2-6,1981.Monterey Califonia.174-175.
|
Akaike.H.,Fitting autoregressive models for prediction.Ann.Inst.Stat.Math.,21(1969),243-247.
|
9Akaike,H.,A new look at the statistical model identification.IEEE Trans.Automat.Contr.,1974,AC-19,716-724.
|
北京大学地球物理系统计预报组,北半球500毫巴月平均环流形势统计预报的试验,数值预报和数理统计预报会议论文集,科学出版社,1974.142-150.
|
中央气象局气象科学研究所,用统计与动力相结合的方法作500毫巴形势的长期预报,数值预报和数理统计预报会议沦文集,科学出版社.1974,116-122.
|